EARTHBOND® Crack & Joint Sealants

Hot Applied Crack Sealant

Hot Applied Crack Sealant for asphalt concrete pavement crack sealing and road maintenance.
Brand:
EARTHBOND®
Shipping
Air / Sea / Train / Truck
Application:
Hot Applied Crack Sealant for asphalt concrete pavement crack sealing and road maintenance.
Get a Quote
Technical Data
Product Profile

High&Low Temperature
Resistant Pavement
Crack Filler

Our technical team has conducted repeated performance tests on asphalt pavement cracks and developed premium hot-applied asphalt crack sealant. This product features powerful bonding strength, high-temperature anti-tracking performance, and low-temperature flexibility with zero brittleness, alongside outstanding anti-aging properties. Our hot melt crack filler has gained quality recognition and approval from road maintenance and construction enterprises globally.

Pls click on the image or review the youtube link : https://www.youtube.com/watch?v=nhYxP1ns1mw

Hot Melt Crack Sealant  Hot Melt Crack Sealant

Hot Melt Crack Sealant

Construction Procedures

  • Preparatory Work

    Set up traffic safety warning signs; position slotting machines and crack filling equipment. Cut grooves to specified dimensions as per construction drawings. Preheat the crack filling machine, add sealant and agitate continuously, maintaining a working temperature of 170°C–200°C.

  • Grooving

    Fit saw blades matching the required groove dimensions (recommended width & depth: 13–26 mm, note: original text "13cm-26cm" is an obvious unit error for road cracks, corrected to millimeters). Adjust cutting depth and carry out grooving work.

  • Crack Cleaning

    Remove loose debris manually first, then fully blow out all dust and residues inside grooves using an air compressor or backpack blower.

  • Crack Filling

    Start pouring sealant only when its temperature stays within 170°C–200°C. The ambient surface temperature of cracks should ideally exceed 10°C. If winter surface temperature drops below 5°C, preheat groove interiors prior to filling.

  • Opening to Traffic

    Roadways can be reopened to traffic 15 to 30 minutes after completion of crack filling.

Standard Configurations

ASTMD6690-2007)《Test methods for hot melt crack sealant for joints and cracks in asphalt and Portland cement concrete pavements》、(JT/T740-2009)《Pavement rubber asphalt grouting glue》。 

Testing Item

Unit

Testing Result

Result

Testing Method

Asphalt Compatibility

—

Pass

Pass

ASTMD5329-2007

Penetration (25℃,0.1mm)

0.1mm

36

30-70

JT/T740-2009

Elastic Recovery (25℃,%)

%

54

30-70

JT/T740-2009

Liquidity (60℃,mm)

mm

4.0

≤5

JT/T740-2009

Adhesion tensile test: 20 degrees tensile 50% 3 cycles passed


Why Go green

Product Application:

  • Maintenance and sealing of cracks on asphalt pavement;
  • Treatment of cracks on old asphalt pavement before paving the asphalt wearing course, and treatment of sub-base  cracks of asphalt concrete pavement on cement concrete pavement;
  • Treatment of bridge head jumping and expansion joints; sealing of reservoir embankment joints
  • Treatment of the joints between the airport runway and the cement concrete plate;
Solution Overview

Package:

  • 12.5kg per box, 80 boxes on a pallet
  • Shelf life unopen: 1 year

Actual photo of the shipment

Related Products

You May Also Need

Explore More Products